Page 26

Supercomputer as well as the rest of the site; towards the right hand corner of the extreme back (exactly opposite to the cooling plant) were the back-up generators and fuel cells that automatically kicked-in in case the power from the main supply station stopped (which never happened except once); in between those two was a tunnel that led to the main Power Supply Station located about Two kilometers away in another underground location built specifically to support B-1 to B-6; in that tunnel, at almost the mid-way point, there was the Water Storage and Pumping facility for B-1 to B-6; and exactly at the center of the site was the space which was the focus of the project. 

“This is where ‘CYBERION-I’ would be located,” said Daniel, pointing at the empty space at the center of the site.